Thursday evening, 2200 hours, finished counter tops, still need to stain and polyurethane edging...
Friday morning, 0400...back to old shop to work on December Luvs. I thought I was done but I am having a hard time saying "no" to folks who still want to get in before the end of the year. Christi said we are done taking orders for 2010 now, better listen to her or I'll face her wrath ;) Trying to get the last 10 done before getting to the Fire Department for a shift at 0630, missed finishing by one bar, argh...
Friday 1930 hours...highlight of the day was helping take Santa off the roof for the annual City of Wooster Winter Wonderland Downtown celebration (photo courtesy of the Daily Record). Here Santa peers over the rim of the platform while FF Meshew guides him to the ground.
Saturday morning, 0710 hours...the old shop is literally four blocks away from the station, so I stopped in on the way home to finish the last steel bar, a 28" piece for Marty at Geekhouse for his personal crosser creation. If you have not checked out Geekhouse, please do. Marty has a keen sense of style mated with a fun funky spirit...gotta love a guy like that :) http://www.geekhousebikes.com/
Saturday morning-ish...the bamboo wood floor layed in the office at the shop
Sunday 0015 hours...finished painting the main shop. Adobe white on walls, Sedona sandstone red on sofit, Deep water blue above for a little accent. Picked these colors to remind me of one of my favorite places to ride...Arizona. Love the red rocks, blue sky, and bright warmth that both invigorates the spirit and sucks out this overweight/out of shape white boys energy :)
Back to saving lives and stamping out disease today (seriously you say?),
Hope you all are enjoying the weekend and are riding somewhere.
rody
Sunday, November 21, 2010
Thursday, November 18, 2010
A dash of paint...
I mentioned that I'd been agonizing over the paint choices for the shop...we'll, I finally threw all the sample paint chips and books away and just went to the store and bought on inspiration.
For the office, I wanted something totally funky and fun, so that I did not feel like I was at work when I'm in there. Caribbean sunrise on the walls with Guacamole and Raspberry accents around all the doors and windows should do the trick...
You can see that I started building the custom desk/workspace yesterday as well. It will have two "desk" portions for a high back stool, a lower corner platform that the computers will sit beneath with room for paperwork and stuff above, and a corner book shelf running vertically that I've yet to construct. I'm throwing down some groovy charcoal boomerang laminate on the counter tops for the final dash of "whoa".
It's not all about fun though, gotta have some function. One of my pet peeves is hearing the air compressor kick on. Funny, the sound of machining doesn't bother me but the two stage compressor irritates the snot out of me, so I've built a cabinet to house it in. The interior walls and ceiling all have 2" sound proofing foam in the wall spaces, building some custom bar doors that will have foam insulation on the back, and a custom vent to prevent overheating. Should keep it nice and quiet for me :) It backs up on one of the paint booth walls, so it will keep the air line run very short so that I'll have little opportunity for condensation build up in the lines...with two traps in 10" of line, the air should be nice and tidy.
On the fabrication front, we are now officially no longer taking orders for Luvs for the balance of the year. Next run will be in early 2011 and there will be a minimal price increase due to material costs rising for us, primarily in Ti. I've been going into the old shop in the early morning and late evening to finish up the December run and should complete all the fabrication today, then off to the paint booth with them.
cheers,
rody
For the office, I wanted something totally funky and fun, so that I did not feel like I was at work when I'm in there. Caribbean sunrise on the walls with Guacamole and Raspberry accents around all the doors and windows should do the trick...
You can see that I started building the custom desk/workspace yesterday as well. It will have two "desk" portions for a high back stool, a lower corner platform that the computers will sit beneath with room for paperwork and stuff above, and a corner book shelf running vertically that I've yet to construct. I'm throwing down some groovy charcoal boomerang laminate on the counter tops for the final dash of "whoa".
It's not all about fun though, gotta have some function. One of my pet peeves is hearing the air compressor kick on. Funny, the sound of machining doesn't bother me but the two stage compressor irritates the snot out of me, so I've built a cabinet to house it in. The interior walls and ceiling all have 2" sound proofing foam in the wall spaces, building some custom bar doors that will have foam insulation on the back, and a custom vent to prevent overheating. Should keep it nice and quiet for me :) It backs up on one of the paint booth walls, so it will keep the air line run very short so that I'll have little opportunity for condensation build up in the lines...with two traps in 10" of line, the air should be nice and tidy.
On the fabrication front, we are now officially no longer taking orders for Luvs for the balance of the year. Next run will be in early 2011 and there will be a minimal price increase due to material costs rising for us, primarily in Ti. I've been going into the old shop in the early morning and late evening to finish up the December run and should complete all the fabrication today, then off to the paint booth with them.
cheers,
rody
Sunday, November 14, 2010
The final push...
The last week has absorbed every spare minute between fabricating, the fire department, and working towards the completion of the shop for the end of November move in target. As such, I've not updated here or any other forums much, so here are a few shots to share what's been happening...
I took an entire day to run the gas, water, and sewer lines last week. Here's a shot of the two utility ditches leading to the new building...
I've set the gas line and secured it to the block so that I can then run it inside to connect to the new furnace. The little yellow wire with it is a tracer line that allows the utility run to be detected in the future if necessary.
The water line uses the Pex system, a fiber reinforced plastic that uses compression/swage fittings to join the system. The system has many advantages; quickly and efficiently ran and installed, capable of expanding during freezing conditions without fracturing, and interfaces with components that match it to Pex, copper, or steel existing plumbing. Here I've connected to the main water manifold using a "shark bite" Tee connector with the white 3/4" main line for the shop...a process that took less than 10 minutes, so cool.
While I waited on the furnace to arrive, it's been on with the slow process of finishing drywall...it's about all mudded up and ready to sand. The ceilings will be knock down stippled, still working on my anal decision on paint colors for the walls :)
A look into the paint prep room and the booth, where you can begin to see the filter wall taking shape. I'm going to be bringing the glass and the old paint booth door with me...a sentimental mix of old and new :)
With the utilities run and the ditches filled back in, the final grading and landscape work will have to wait til the springtime...
Since these pics, the furnace has been installed, the final wiring and tubing run for the AC unit, the office, bathroom, and paint prep area sanded and primed, and the ceiling completed in the paint prep area. Whew!
So much to do yet, gotta keep moving forward.
cheers,
rody
I took an entire day to run the gas, water, and sewer lines last week. Here's a shot of the two utility ditches leading to the new building...
I've set the gas line and secured it to the block so that I can then run it inside to connect to the new furnace. The little yellow wire with it is a tracer line that allows the utility run to be detected in the future if necessary.
The water line uses the Pex system, a fiber reinforced plastic that uses compression/swage fittings to join the system. The system has many advantages; quickly and efficiently ran and installed, capable of expanding during freezing conditions without fracturing, and interfaces with components that match it to Pex, copper, or steel existing plumbing. Here I've connected to the main water manifold using a "shark bite" Tee connector with the white 3/4" main line for the shop...a process that took less than 10 minutes, so cool.
While I waited on the furnace to arrive, it's been on with the slow process of finishing drywall...it's about all mudded up and ready to sand. The ceilings will be knock down stippled, still working on my anal decision on paint colors for the walls :)
A look into the paint prep room and the booth, where you can begin to see the filter wall taking shape. I'm going to be bringing the glass and the old paint booth door with me...a sentimental mix of old and new :)
With the utilities run and the ditches filled back in, the final grading and landscape work will have to wait til the springtime...
Since these pics, the furnace has been installed, the final wiring and tubing run for the AC unit, the office, bathroom, and paint prep area sanded and primed, and the ceiling completed in the paint prep area. Whew!
So much to do yet, gotta keep moving forward.
cheers,
rody
Monday, November 8, 2010
Hoodie availability...
Ok folks,
I purchased extra hoodies for use as prizes for the final race, but being that they are about 3 weeks late, they are available for y'all to purchase.
Here's what I have left...
Charcoal - 1 XL
Brown - 1 Large, 2 Medium
Royal Blue - 2 Large, 2 Medium
Racing Red - 1 XL, 1 Large, 1 Medium
Pink - 2 Medium, 1 Small
Price is 45 bucks shipped in the US, 8 bucks extra for international.
Please drop us an email at rody@groovycycleworks.com if you are interested.
cheers,
rody
I purchased extra hoodies for use as prizes for the final race, but being that they are about 3 weeks late, they are available for y'all to purchase.
Here's what I have left...
Charcoal - 1 XL
Brown - 1 Large, 2 Medium
Royal Blue - 2 Large, 2 Medium
Racing Red - 1 XL, 1 Large, 1 Medium
Pink - 2 Medium, 1 Small
Price is 45 bucks shipped in the US, 8 bucks extra for international.
Please drop us an email at rody@groovycycleworks.com if you are interested.
cheers,
rody
Sunday, November 7, 2010
WARNING, Caution, etc...
Got camera happy yesterday. Here's an inside look at the machines that make up the shop...
and while not an integral part of the shop, this one did belong to the next door neighbor before closing their doors...
cheers,
rody
and while not an integral part of the shop, this one did belong to the next door neighbor before closing their doors...
cheers,
rody
Saturday, November 6, 2010
Bikes are fun, work is, uh...work :(
Ok, I won't bore you with the details, but the majority of this week disappeared in the Fire Department to the tune of 96 hours. Thursday was the only day off for shop work, and I spent it working on the new shop by hooking up the septic, running the main water supply line, and running the natural gas line for the furnace to be set on Friday.
By the time I got off duty this morning at 0700, I was feeling pretty mentally and physically brain dead. Christi is out of town again for a couple of days, so I drug the kids to the shop with me to try to get something that borders on productive accomplished. Bar orders have been hopping. As these are pretty much a mindless task, I put the hood down, turned the music up, and pressed the pedal.
Tired of steel, moving to Ti...
Emmy starting wash phase one of the ti parts...
We worked until about 1630, then decided to call it a day, grab some Coccia House pizza, and head for home.
Hoodies and tees arrived sometime this week, I ordered extras so I'll post up what's available tomorrow. Here's a sample shot of what was on top of the box...
By the time I got off duty this morning at 0700, I was feeling pretty mentally and physically brain dead. Christi is out of town again for a couple of days, so I drug the kids to the shop with me to try to get something that borders on productive accomplished. Bar orders have been hopping. As these are pretty much a mindless task, I put the hood down, turned the music up, and pressed the pedal.
Emmy starting wash phase one of the ti parts...
We worked until about 1630, then decided to call it a day, grab some Coccia House pizza, and head for home.
Hoodies and tees arrived sometime this week, I ordered extras so I'll post up what's available tomorrow. Here's a sample shot of what was on top of the box...
Subscribe to:
Posts (Atom)



