Thursday, January 28, 2010

Shimano Direct Mount FD...fabrication

Yep, I know it's been too long since the last post...you can hold my eyebrows in protest if ya like ;) 

I've been working away at finishing some final work before I can start on customer projects for the show.  Most of it has been fairly mundane work, hardly worthy of presenting and capturing your attention with, but I did snap a sequence of shots for one special project.

Today, I thought I'd share with you the Shimano Direct Mount Front Derailleur and what it takes to fabricate the necessary mount for the frame to utilize it.

The redesigned front derailleur is a boon for folks who like to run big wheels with short chainstays, odd shaped seat tube configurations, or desire the ability to creatively place a derailleur regardless of seat tube size or shape.  It can be used in a bottom or top pull configuration, mounts directly to a fabricated plate the framebuilder creates, and reduces the clamp and much of the garbage that extends towards the rear of the piece that reduces tire clearance and collects mud.

The interface on the rear of the derailleur is comprised of a flat plate with a projected ridge and a M6 slotted hole to allow up to 5mm of vertical adjustment.  The projected ridge allows the derailleur a secure interface to prevent from rotating on the frame mount.

To machine a mount, Shimano provides a tech document with most of the desired dimensions, though I found that I needed to modify a few for better performance and aesthetics.

To get started, I cut down a piece of stock 1/2" x 4" steel into two pieces that will eventually become four mounts.  I then face milled all the pieces to insure clean, square dimensions to begin working from.  Once machined to my desired starting dimensions, I grabbed the edge finder to establish a known reference point.

Next up, I positioned the mill to cut the support slot for the derailleur over the vertical length of the mount.


Multiple passes and a little patience helped me achieve the final depth necessary...nice and clean with a .01" tolerance.

After cutting the slot, I cut the two pieces into four and milled to the final dimensions. 

I then repositioned the pieces in the mill, reestablished my origin point, and found the center of the M6 bolt hole.  Creating the hole is a three step process; using a center drill to start, an undersized hardened drill bit follows, then machine tap the hole for the anchor bolt.

Tapping in the mill is a nice process and can be done easily with some care and due attention.
Once the holes were all created, some quick math helped me determine the center of bottom bracket to outside face dimension necessary for the bottom bracket witdth I was using.  I then determined where on the seat tube the mount would need to sit for proper alignment.  Armed with this knowledge, I was able to mill the back side to the appropriate depth and position.

The finished piece...



Holding it in place on the derailleur, you can see how the two pieces fit and the vertical adjustment that is possible.


Should make for a clean, custom touch on geary bikes.  A bit more time on this end to do it right, but well worth it for the benefits.

cheers,

rody

Wednesday, January 20, 2010

Black and white Bonty Dart for James

Here ya go James, your black to white Dart stem for the dropbar Bonty...


I moved a bunch of pieces through paint today...still have one final coat of clear to shoot, will let it sit over the weekend, then shipping them all off on Monday.

Glad to be off the throne and in the paint booth ;)

rody

Tuesday, January 19, 2010

Been battling it out, and losing...

Yup, the last couple of days I've been fighting the seasonal stomach flu and have spent the majority of my time close to here...

I did have an opportunity this weekend to get started on some paint work though, spraying a bunch of custom color bars and James's stem in two coats of sanded primer.  Had to run (literally) out of the shop though to pay tribute to the porceline god when this all began.


Been surviving on frozen Italian ice the last two days...easy to eat and doesn't upset the stomach.  Feeling a bit better today, hoping to actually be productive in the shop tomorrow.

Don't forget to wash your hands folks ;)

rody

Friday, January 15, 2010

BOI for sale...

Hey folks,

The tough economy has hit a customer hard and he is not able to follow through with his commitment to purchase his Big One Inch fork, so it's up for grabs.

Here's the details:

Groovy BOI replica fork
1.125" steerer, uncut
430mm axel to crown length, Old school 80mm suspension corrected
1.56" standard offset
canti bosses
currently in primer...pick your color!
$315.00 plus shipping




Interest will be taken in the order received, so drop me a line at rody@groovycycleworks.com

cheers,

rody

Thursday, January 14, 2010

James's Drop bar stem...

James has been patiently awaiting a high rise stem for his Bonty drop bar project so I thought I'd share a few pics of the process from yesterday.

Laying out the dimensions on the table...


The stem will use a removable face plate for a 31.8 clamp diameter, an 1.125 steerer tube and an ovalized/offset stem body for better rigidity and support.


Once the tubing is pulled out of the stock, it's time to cut it up to rough lengths, into the cold saw it goes...

With the rough lengths completed, it's time to turn down to final length, true the edges, debur, and chamfer


Now we'll miter the ovalized center section to fit the handlebar clamp...I'll offset the center of the cut just a bit to allow more material to wrap under the clamp for a bit more support.


Clean them up by sanding off the mill scale, run them through the degreaser tank, and then into the ultrasonic cleaner for final weld prep.   Let's tack them together, shall we?

and weld it all up...

Now to do the steep miter for the steerer section.  A 53 degree miter is required, so I split the difference by setting the stem into the vice with a 30 degree angle plate and tilting the milling head to 23...the cutter is advanced with the quill feed nice and slow so that it doesn't skate across the surface.


Wanna know a little trick to help set this kind of stuff up?  The angle plate the stem is gauged off of is much thinner than the width of the stem body, so it is tough to keep it in place and from falling over while you get the final position dialed.  I use two of those little foam pieces that come in the Thomson Elite stems (to keep the clamp inserts from falling out) on either side of the plate; it snugs everything up and you can still tighten/loosen the vice without changing it's position.  There are a few parallel holders available through MSC and such, but I'm too cheap, I mean innovative ;)

Once everything is mitered and cleaned, it's time to weld it all up... fits the table layout perfectly :)



Next, I tacked on the binders, silvered them in place with 45%, split the binders and plate with the cold saw, and ran it through the media blaster.  Final pics once she's all painted up.

cheers,

rody

Monday, January 11, 2010

End of the year numbers...



Not that anyone really cares, but I've been spending the last couple of days getting ready for Tax time and have compiled some numbers that are an interesting look into the work/life of running a frame shop.  Some of the catagories surprised me, and others are just a little interesting.

So, without further ado, the 2009 end of year numbers of no significant importance  :)

Total number of customers served....   265 (frames, bars, stems, forks, restos, etc...)

Number of failed products ... 1 (1 bent Luv bar from jumping a creek and hitting a tree, sponsored rider)

Number of maroon Scotchbright pads used ... 25

Number in feet of 80 grit shop roll used ... 75

Number of times I cleaned the paint gun ... phhht, I don't even want to think of this!

Number of wheels built ...  11

Number of countries Groovy products are now found in ... 26

Number of customer inquiries/emails / comments received... 4982

Number of email responses sent ... 3919

Number of magazine appearances of Groovy products ... 2 (thanks to Dirt Rag and MBA)

Number of Blog posts ... 146

Number of folks who stopped by the spring open house ... 25

Number of races sponsored/attended ... 7

Total product donations for races, charity fund raisers ... $6607.00

Number of days I got out to ride ... 32

Number of pounds gained due to my miserable number of days ridden ... 25

Number of out of state rides ... 9 (6 in AZ, 2 in Pa, 1 in WV)

Number of flat tires changed at races as neutral support ... 8

Number of times Christi threatened to quit and came back ... 3

Number of hours dontated for local trail work ... 28

Number of hours worked at the shop (not inclusive of email/blog/races) ... 1664

Number of hours worked at the Fire Department and teaching/medical instruction ... 4313

As we head into the new year, I'm looking forward to sharing another 365 days with y'all   ;)

cheers,

rody