Well, the new week has arrived for me and so too has the start of show prep. I've got 24 days to tackle the build list, consisting of; two frames, 4 wheels, two one piece stem/bar combos, two seatposts, one ti fork, 15 steel bars, 10 ti bars, and get everything painted, coated, assembled, packed and shipped. Gonna be a long haul.
Today I worked on masking and powdercoating a frame in jollypop metallic red over sterling silver, finishing a second frame repair, began paint on a resto, and got moving on the steel bars for the show and March orders.
With the weather being a beautiful 54 degrees and sun (whoda thunk on Feb 1????) I actually jumped on Kaltens road bike and did 10 miles before having to attend to parental chaperon duties for the evening. Felt good to be back on a bike, as the last time I rode was back in July...ughh.
More later...
rody
No comments:
Post a Comment